Equipment Status

본문 바로가기

Foamed Pad Division

Equipment Status

Equipment Status

Foamed Pad Division – Facility Status

Sealing Machines – 3 ea.

Machines that automatically turn laminated materials into products using the mold design

Thomson Processing Machines – 4 ea.

Machines that automatically turn laminated materials into products using the mold design

Thomson Press – 2 ea.

Equipment to produce precise dimension parts using molds

Material Cutting Machine – 2 ea.

Uniform cutting of warehoused raw materials to prepare for Thomson processing

Laminating Machines – 2 ea.

Equipment to laminate materials and films on release paper

Cutting Machines – 3 ea.

Machines to cut tapes and materials

Process Flow of Foamed Pad Division

Work Process of Foamed Pad Division

1. Receiving inspection

100% total inspection

2. Cutting

Error rate controlled within 5%

3. Lamination

Minimized loss

4. Sealing

Core product technology (know-how applied)

5. Thomson

Core product technology (know-how applied)

6. Inspection

100% total inspection

7. Packing

Reflecting packing specifications of each customer

8. Shipment

On-time shipment system